The First Time to Run the Machine

The First Time to Run the Machine

Preparation before formally processing documents


Before starting processing, please make sure that the equipment is in good condition (i.e. external equipment installation and software connection have been completed). If necessary, please read the following article first.


Procedure

1. Turn on the computer and connect to the software



2. Open the software and import the files to be processed





3. Adjust the file size



4. Set processing parameters. You can set processing parameters according to the processing parameters

Material tool test results.



5. Send files to the machine




6. Place the materials on the working platform.



7. Move the laser head over the material



8. Focus Complete




9. Move the laser head to the desired starting point

  
  



10. Click to locate and select



11. Click Start Processing



12. Processing completed



    • Related Articles

    • Connect XT&XRF To LightBurn Via Ethernet

      Operational Guide Configure computer 1.Connect the machine and computer with Ethernet cable. 2.Go to Start > Control Panel > Network and Sharing Center, configure the connection for local connection. Like below. 3.Select Properties. 4.In the ...
    • One Laser Hydra Touchscreen Function Introduction

      Introduction: This document offers a comprehensive guide to the functions of each button on the control panel, ensuring a thorough understanding of their operations. 1.How to use the display 1. Z axis button: control the table to move in Z-axis. 2. ...
    • How to use One Laser Hydra camera

      ntroduction: The purpose of this document is to instruct users on how to connect, calibrate and use the One Laser Hydra series camera. Preparation USB cable*1, PC*1, USB flash drive*1, Lightburn software Connecting the machine and the camera 1. ...
    • Dual-Source Installation Tutorial

      Dual-Source Installation Tutorial Preparation Work Hex wrench Door cover key Crosshead screwdriver Installation screws Upgraded accessories related to the dual-source installation Mechanical Installation 1.Installation of the RF Tube ①.Use M4*12 ...
    • How to adjust the backlash parameters

      Note: The reverse clearance of the equipment has been adjusted to the best engraving effect before leaving the factory. Please do not adjust it at will unless you encounter special circumstances. At the same time, the engraving reverse clearance ...